how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
how many kg of 20mm, 10mm, dust available in one ton stone boulder
what is moment-curvature relationship in semi rigid connections??
What is the exception critarea of cube?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
water leak detection system question & answer
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
silt%= silt volume/ silt+sand volume is this right?
how to find out hard strata in bored pile when the DMC method adopted.
What is the Hardness of M-40 grade concrete, general and theoratical