How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / sag
Volume of bricks with mortar=.2*.1*.1=.002
No of bricks=1/.002=500
Volm of 500 bricks=.19*.1*.1=.7695
Volume of mortar=1-.7695=.2305
Add 15% for wastage and 30% for dry mortar
Now volume of plaster=.2305+.2305*.15+.2305*.3=.334
1:6 cement and sand 1+6=7
Volume of cement=1/7*.334=.048m3=1.36 beg
Volume of sand= .048*6=.288m3
| Is This Answer Correct ? | 33 Yes | 5 No |
Post New Answer View All Answers
how much percent are used 20mm,10mm?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Why are steel plates inserted inside bearings in elastomeric bearing?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
strength vs shape factor
What are the phases inspections are done by local authority while construction?
What are the uses of layer?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
can any one explain bar bending schedule of bems and columns and slabs ??
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
what is kribs is supporting?