How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / sag
Volume of bricks with mortar=.2*.1*.1=.002
No of bricks=1/.002=500
Volm of 500 bricks=.19*.1*.1=.7695
Volume of mortar=1-.7695=.2305
Add 15% for wastage and 30% for dry mortar
Now volume of plaster=.2305+.2305*.15+.2305*.3=.334
1:6 cement and sand 1+6=7
Volume of cement=1/7*.334=.048m3=1.36 beg
Volume of sand= .048*6=.288m3
| Is This Answer Correct ? | 33 Yes | 5 No |
Post New Answer View All Answers
Why is concrete cube test carried out?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
For Wet Mix Mecadam design what is Optimum moisture content
What is componsation
Define mirror?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is min thickness,min grade of conc & age of PQC ?
what are the code used for residental building?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
What are the different theories of failure under static load?
crank types
whou haat goals do you have in your career
in one SQM plaster how much Cement and sand consumed in ratio 1:4