WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK
CONSTRUCTION OR BRICK CONSTRUCTION?
Answer Posted / yogesh anbhule
BRICK CONSTRUCTION
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
Describe the role of independent Quantity surveyor?
Define What materials were used to build the Golden Gate Bridge?
how to calculate number of bitumen for road asphalt
How to testing voids of filled aggregate in bitumen mix design
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Water filter calculation formula
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the use of beam end forces while using a staad ? wha they are show
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20