Bitumen grades are 30-40,60-70, 80-100. what is mean by 30-
40
Answer Posted / nilesh ghadge
IT MEANS IT HAVING THE PENETRATION VALUE BETWEEN 30 TO 40
| Is This Answer Correct ? | 141 Yes | 47 No |
Post New Answer View All Answers
How much cement is require in one sqft area in a G+3 residential construction.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is gravity flow?
What is the ideal size of the living room ranges from small to large size?
Define block?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Which is the best book for building construction?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What are the different approaches in designing the floors of the service reservoirs?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
can you provide a link for manual design of building?