Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

2.5mva transformer is installed in our company with oltc
but it is not working in auto mode ,it is operative in
manual mode control wiring is done how can i rectify it?

Answer Posted / sandip upare

Once you can try changing phase sequence of tap changing
motor.

Is This Answer Correct ?    0 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if we have 320KVA Genset kindly advice how much load we can put it.

1520


what are the parameters plays a major role in Potential transformer Burden calculation??

2187


In TNC switch, is there any 1NO+1NC block ? and if we move over closing position, is ther any affect on trip position or vice versa?

2236


what are the application of over current relay?

5236


How do we calculate over and under frequency tolerance from generator data?

1605


how to select proper cable for ct wiring so that drop within the limit.

1967


What is the estimated total hydropower potential of india?

1131


how to compute kvar in substation feeder to improve power factor and sending voltage

2134


what is transient enclosure vltage , very fast transients, very fast transient over voltages

2147


On what principle electric motor works?

1195


What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.

2673


please send me the L&T Emb. sys. placement papers and entire details of pattren

2323


i have to install a HT panel, what components, I have to use in this and what will the diagram of that diagram,please tell me each and everything.

1806


What kind of preventive maintenance are there for transformer?

2259


what is efficient motors and how it is different from normal induction motors

1908