How can we cross check the excavation and backfilling
quantities.

Answer Posted / sjtbehera

cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How did street originate in the plumbing term street ell?

624


what discoveries did you have in relation to your course?

1652


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1361


How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance

2417


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1835






What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1953


why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.

1464


What is the use of array command?

689


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1626


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1730


What Reinforcements Are Used In The Process Of Prestressing?

835


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1426


What is the purpose of the gap in the road on this bridge?

691


how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1878


Are you ready to relocate with your immediate family to United States as a new employee?

4870