How can we cross check the excavation and backfilling
quantities.
Answer Posted / sjtbehera
cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What are the causes of building collapse?
Which code is used for tor & tmt steel bar?
how u design STAGING for Superstructure in BRIDGE construction?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
Define What glue is least sticky?
I want to join bhel because
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What is the difference between Fe 500, Fe 500 D and Fe 515.
How do you prepare Material Recovery Statement for deduction from contractors bills?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is Joule Brayton Cycle?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
about higyway engineering
dialation means