How can we cross check the excavation and backfilling
quantities.
Answer Posted / sjtbehera
cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What are new methods /technologies of pothole patching?
How do you determine specific gravity of cement?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
What is meant by cad?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
What do you mean by bond? What are the different types of bonds?
Test procedure of fly ash bricks as per code ?
What is the different type of slump test indications?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
what is the basic difference between Coloumn & Shear Wall
What are the problems one might face while having a Cantilever balcony?
I need to constructive work in amaraj batteries
List out some of the common problems that architect have to tackle it?