Whether the DP transmitter can be utilised in the medium of
Vaccum for the measurement of Level?
Answer Posted / sankarithi
Hi Friends i finally succeeded to take the DP transmitter
into line for the Measurement of Level which is under
vaccum. The following steps to be followed.
1. Transmitter range should be in Positive side only.
2. Transmitter HP should be connected with the Level
chamber bottom side and maintain very less gap between
Level Chamber and Trasmitter HP end.
3. Connect Transmitter LP end with the Level Chamber Top
End and elevate the Pipe line 11/2 mtr above the tank level
in order to ensure that there will not any water entrance
into the LP side impulse line. We need to maintain LP side
without water.
4. All Joints should be tight and there will not be any
leakages.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the formula of vabration sesore. i mean how to covert mils to volt plz share if any body knows very argent : my mai is merajalam143545@yahoo.com
Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks
How ejector(or)evactor air pump is working in thermal power plant?
How to work togather like sov,limit switch,proxy switch and booster in xv
how many maximum enter 2mm Dia solid cylindrical pipe into 8mm Dia hollow cylindrical pipe. give answer with calculation.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
Definition of reverse and acting controllers:
Why mixer nd grinder Is example of constant torque load not variable torque load ???
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
Why do we floating DC in DC system.
What is heating effect?
What is the principle of capacitance type level transmitter?
why we take %i0.0 as input for twido plc
Explain operation of Haskel pump.
please send the drdo exam paper