How much wastage we considered for cement
Answer Posted / praman srivastava
the wastage for steel & cement for mainly consider for
handling , tranpotation & workmanship & in case of steel
wastage consider for cutting bending & scrap during
work.Approximate 3% wastage consider for above as per CPWD
Norm.
| Is This Answer Correct ? | 44 Yes | 10 No |
Post New Answer View All Answers
What are the benefits of rcc pipes over steel designed pipes?
types of piles detail,
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
what is the procedure of wet seiving. n percentage of silt in different type of soil?
all technical question
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
what is the price of a cubic meter of concrete on international market?
How much cement and water required for cement selery????
how to calculate spacing rod in column
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How is improve my knowledge in construction industries....
How to calculate steel for beam slab and column
What is chemical composion test
how much cement sand n bricks required in im3?and how much in plaster?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh