How can we cross check the excavation and backfilling
quantities.
Answer Posted / praman srivastava
In case of foundation like Load Bearing , Isolated footing
or raft , Total excavation calculated as per plan & require
depth form NGL & deduct the total qty of pcc cc or B/w up
to NGL,then total balance qty is known as backfill.Approx
60% qty.of excavation is required for back fill.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
what is the use of beam end forces while using a staad ? wha they are show
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
(Project Management Topic) What are the important criteria in the successful realization of the project?
The definition of national highway
how to find out hard strata in bored pile when the DMC method adopted.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
What is the difference between undo & redo?
what motivates you to do a good job
how u design STAGING for Superstructure in BRIDGE construction?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is the largest concrete dam in the world?
what are the proper pipes for salt water line
TELL ME THE EQUATION FOR OGEE SPILLWAY
Define What are the reasons for geotechnical site investigations in Uganda?