Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can we cross check the excavation and backfilling
quantities.

Answer Posted / praman srivastava

In case of foundation like Load Bearing , Isolated footing
or raft , Total excavation calculated as per plan & require
depth form NGL & deduct the total qty of pcc cc or B/w up
to NGL,then total balance qty is known as backfill.Approx
60% qty.of excavation is required for back fill.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the use of beam end forces while using a staad ? wha they are show

2965


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

2283


(Project Management Topic) What are the important criteria in the successful realization of the project?

2157


The definition of national highway

1808


how to find out hard strata in bored pile when the DMC method adopted.

6060


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

5207


What is the difference between undo & redo?

1249


what motivates you to do a good job

3190


how u design STAGING for Superstructure in BRIDGE construction?

2371


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

1515


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

2136


What is the largest concrete dam in the world?

1180


what are the proper pipes for salt water line

2338


TELL ME THE EQUATION FOR OGEE SPILLWAY

2583


Define What are the reasons for geotechnical site investigations in Uganda?

1151