How can we cross check the excavation and backfilling
quantities.
Answer Posted / praman srivastava
In case of foundation like Load Bearing , Isolated footing
or raft , Total excavation calculated as per plan & require
depth form NGL & deduct the total qty of pcc cc or B/w up
to NGL,then total balance qty is known as backfill.Approx
60% qty.of excavation is required for back fill.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
What is the tensile strength of wood?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
how many cement used in single story residential building per sqft
how to control PQI (Project Quality Index)
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Explain the difference between shear and tensile strength.
Give me an example of a time when something you tried to accomplish and failed.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Material calculation of cm 1:6 for 1sqm
What are new methods /technologies of pothole patching?
What are the applications of modulus of elasticity?
where can i get the previous question papers for rrb section enginerr (civil)