How can we cross check the excavation and backfilling
quantities.
Answer Posted / praman srivastava
In case of foundation like Load Bearing , Isolated footing
or raft , Total excavation calculated as per plan & require
depth form NGL & deduct the total qty of pcc cc or B/w up
to NGL,then total balance qty is known as backfill.Approx
60% qty.of excavation is required for back fill.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
dialation means
Define What is rigging?
TELL ME THE EQUATION FOR OGEE SPILLWAY
whou haat goals do you have in your career
what is civil enginnering & what you need of this course?
Difference between lime, distemper and plastic emulsion?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
What is the difference between Grade I, II and III of GSB?
The concrete slump recommended for beams and slabs; is?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
what is smart building materials?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in