Is 456 revised lastly in which year? & What are the revisions?
Answer Posted / nikul prajapati (baroda)
ITS IN THE YEAR OF 2000 IT IS REVISED LASTLY.........
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
How you can turn off the display for dimension in CAD?
Why should pumping be not used in case of concreting works?
What is Grid floor and mention its advantages ?
For Wet Mix Mecadam design what is Optimum moisture content
What you understand by building codes?
how to stop beam concrete between column
What is the quantity of cement in mix m20 concrete?
how much to get of BRC lapping in full yield and half yield ?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
what is stressing
What are the advantages and disadvantages of using plastic and timber fenders?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com