IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / s mukhopadhyay
Good Civil Engineers, before posting any answer, must also
write the matter in clear English for others to really
understand the content.Also, decency should always
maintained.
Limit state is definetely a superior version of design as
it guides to designing a structure considering all
eventualities and all overall structural failure conditions.
Regards,
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Formula for calculating the volume of bulb in underreamed pile
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What is the use of water table & Kreb stone for drain
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is that one cub metre plaster in cemant and fine sand
how we can find sieve #4 is 4.75mm?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What is the coeffiencent Friction Angle between Steel and Ashphalt?
Basic civil interview questionsÂ
How do we calculate absolute pressure?
How to check slab shuttering level.? Or check list for slab ?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??