IN A MAGNETIC MATERIAL HYSTERYSIS LOSS CAN'T BE REDUCED TO
ZERO. HY?
Answer Posted / hari
Hysterysis loss depend upon the hysterysis loop.every
magnetic material have a some have some hysterysis loop ,so
we cannot reduced the hysterysis loss.but it can minimised
by using suitable materials like silicon steel.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what happend to DC shunt motor if its field winding insulation becomes slightly weak? will that motor can run on full load or not explain in detail. thanks
power transmission pole used one support , that only for support or earthing
why we have and use 3 phase not 2 or 4 or other in power system?
Difference between field rheostat and armature rheostat.
What are motor generator sets and explain the different ways the motor generator set can be used ?
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.
True or false question. 1.The fuse provide phase and neutral 2.power loss in electrical circuit can take place in (resistance or inductance or capacitance). 3.two phase system each phase has separated by a phase difference of (90 or 180 or 270 or 45). 4.3 phase balanced star connected load neutral current shall be (line current or phase current or zero or unity)
how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.
If 24 KVA AVR having Input voltage 200-400v, Output voltage 415+-1%, what will be the voltage if Load is 13A.
Which is the oldest hydropower plant in india?
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
How many types are using in 220kv/400 kv swith yard
how to changeover ups in this power failur time?
does any one know where we can purchase insulation oil for high voltage oil filled cables