WHAT IS THE DIFFRENCE BETWEEN EARTHED AND UNEARTHED CABLE
(XLPE)?
Answer Posted / ashim sarkar
I fully agree with the comments of Mr. C. Satheeshkumar.
Insulation level for Unearthed system is root over 3 times
the insulation level for Earthed system.
Earthed system - Insulation of 19 KV for 33 KV system
Unearthed system - Insulation of 33KV for 33 KV system
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
being an electrical engineer why you wanna come into software i have an very good academics what answer i have to give
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
HOE WE CAN IMPROOVE BY USE OF CAPACITOR
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
Difference between On Line capacitor and Station Type capacitor.
How to address the servo drive for motor
What are the different types of hydro schemes?
Could Please Explain briefly. Why used stabilizing resistance series with High impedance bus differential protection relay.
# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in
How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.
State ohm’s law?
What is CCT (Correlated Color Temperature) ?
what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?
Why ground terminal is used in pot meter 10k ohms
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.