1 cubic meter contains how many bricks
Answer Posted / santosh singh
hi,
1 cubic meter contains 500 bricks of size 20cm x20 cmx 10cm
this is standard.
if size of brick varies then u can find it like this
no. of bricks = total volume of work/ volume of one brick
Is This Answer Correct ? | 888 Yes | 242 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
how to caluclate sienerge qty in construction in ap
What was asked in isro civil interview
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What will you do if a portion of load bearing wall collapses under your supervision?
What are new methods /technologies of pothole patching?
Define What is passive earth pressure ?
Explain what is alternate bid?
What are the basic use of runners and standards of pipelines?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Differentiate first angle & third angle projection?
what is tension & compression of steel bending.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft