Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

a 3 phase slip ring induction motor is wound for 4 poles on
stator and 6 poles on rotor; when 3 phase balanced voltage
source at 50 hz is applied to motor it will run at
a)1500rpm b)1000rpm c)750 rpm d)zero rpm

Answer Posted / sayem

1000

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is bode plot?

1304


If a high resistance fault occurs,then what are the changes will happen in the system?

1520


What is the bundle conductor?

1262


all details of DG UPS HVAC

2140


when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....

1819


what is interfacing in computer studies?

1825


How is operate breaker failure scheme in substation

2174


Can we convert off line transformer to on line transformer

2021


How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.

1545


How to calculate no of EARTH PIT? Describe the formula as per IS standard?

2242


what is meant by directional earth fault and non directional earth fault? describe both.

1942


what is the difference between dry and wet type of 132kV terminations. which one is durable

2057


what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?

2094


Transmission through a short line depends on

2316


i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.

1992