1) what is the seewage discharge per person per day taken
for design purpose as per IS codes? 2) how to convert gauge
to MM like if we measure 18G as our door frame then how
much is it in MM ? 3) how much binding wire is required ti
tie 100kg steel ? 4) while making rings in steel
reinforcement , whether the corners of rings are deducted
to take out cutting length ? 5) how much carbon content
should be there in steel used for construction purpose? 6)
what are fe415 & fe 500 and which bars are used in general
civil works?
Answer Posted / santosh singh
1) sewage discharge per person is 120 litres/day
2) 18 gauge = 1.210mm there is a chart i will be sending
you if u want just tell me your email id my email address
is santosh29civil@gmail.com
3) for 1 ton 9 to 13 kg of winding wire is required ie.
for 100kg you will need 1 kg winding wire approximately
4) no the cutting length of beam or column ring is
calculated by foll. formula
total cutting length of ring = 2( a + b )+ 24d
where a = long side of ring
b = short side of ring
d = diameter of bar
remember when a bar is bend by bar pipe the bar extends by
2d
5) not more than 5%
6)fe415 & fe500 are high yield tensile bars used in
construction also mils steel ie fe230 is used in
construction work.depending upon type of load & stress
designer chosses the types of bars ...ie fe415 & fe500 tor
bars are used as they are having high strengths
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
What does a construction cost covers and what does not?
How to calculate 1 brss for RCC work
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
How many cum of 9.5mm stone in 1 ton ?
What is the different type of slump test indications?
115mm thickness brick work how to required mortar
Can we use concrete of slump cone in cube casting in which we have already measured slump?
How much cement,sand,bricks and water needed for 1square metre brick work?
Explain soil analysis?
how statics is different from dynamics
Why reinforcement done in shorter span in two way slabs
plz.show development and anchorage length in simple diagram.
Moisture content calculation for diff mix ratio's ??
how to convert sand in Cft to Kgs
What is chemical composion test