How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / mandeep thakur
By this Formula we can Work out roughly, But Not 100%
Correct
0.3*28.8/sum of Ratio e.g(1:4 is equal 1+4=5
than .3*28.8/5 Only For brick Work.
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Define What is a kip?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is kribs is supporting?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
hi guys what happens if you are absent for a supplymentry exam?
what is the difference b/w full length and cutting length?
What is Gsb tollens ?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
Please let me know what is the simplest way of Calculating Mix Designs
How to cal. The weight of hollow pipe?
How to determine spacing of bars in slabs or beams
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?