Answer Posted / vascon
it is the levelling coase which is done below structure.why
plum means if the thickness of pcc more than the
requirement then prefer plum concrete.
| Is This Answer Correct ? | 52 Yes | 25 No |
Post New Answer View All Answers
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
density of crush sand & crush stone or grit powder
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
how many tonnes equals to one cubic feet?
why we can use dust in concrete insted of fly ash
What are the benefits of rcc pipes over steel designed pipes?
what is high type road and low type roads
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What is need for setting limits?
what r you reqired for concrete baching plant?
why the profile of shell of natural draught cooling tower is hyperabolic.
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Explain what is Critical Path Method (C.P.M)?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?