Answer Posted / vascon
it is the levelling coase which is done below structure.why
plum means if the thickness of pcc more than the
requirement then prefer plum concrete.
Is This Answer Correct ? | 52 Yes | 25 No |
Post New Answer View All Answers
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
How to calculate plastering for elevated water storage tank
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
how to calculate valuation for the old building?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is flexible and rigid footing?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
Which code is used for tor & tmt steel bar?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
What is the cost difference between site mix and ready mix concrete per cubic meter
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What is difference between code and standard and specification?