9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / manikandan ramia sankaran
1. 9.00m x 9.00m x .15m
= 12.15 m3
12.15/(1+4+8)[x] 1.56 = 1.458m3 of cement
sand = 4 x 1.458 = 5.832 m3 of sand
4omm agg = 8 x 1.458 = 11.664 m3
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Why the finite element method is lower bound solution?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How do you compute volume of airflow?
Which ratio use for cement selery???
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
How to find out kg per Sft ?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what is that one cub metre plaster in cemant and fine sand
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Which is the latest version of solidsworks?
Which is the most prominent tower of world?
What are your future hopes for this job?
explain what do you mean by the property development.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs