why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
Answer Posted / suresh.s
the cement strength also prepared for 28 days
| Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
Exterior Joints,define
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
what is the weight of 10mm,20mm,40mm aggregate
what is civil engineer greatest strength and weakness?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Define What is an ice dam sock?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
Why are the bolts that hold steel rails together in oval holes?
What is Architect-Prepared Contract?
what is kribs is supporting?
How much cement and sand required for 9"brick wall per square metre
How to calculate 1 brss for RCC work
Why are steel plates inserted inside bearings in elastomeric bearings?