motor is 12.5hp after starting few minets motot get hot?
why?
Answer Posted / chetan
12.5 HP Motor gets heated after few minutes dure to the
losses in motor i.e., iron losses coper losses , windage
losses , friction losses and these looses comes into play
on account of resistance present in the motor circuit.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
Why using synchronising methed in DG's sets?
How are load losses and no-load losses measured at site in a DG set?
why various test are performed on electrical panels & power cables before commissioning on site & what are these test???
What will be the effect of circulating current in HT xlpe cable when both the armour ends are grounded. Will the termination fils after some time in case of 33 kv supply.
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
What is use of starter and choke in tube light
why induction motors are rated at 0.8 power factor.
Please give me a erda placement paper
How you will determine the volume of oil in a particular Distribution transformer.
what is the significance of cabability curve of alternator
how to decide the panel size like MDB ,SMDB PANEL SIZES
WHAT IS FAULT CAPACITY OF HT MOTOR TERMINAL BLOCK? ANY BODY HAVE ANSWER PLZ....POST IT.
I just purchased a 4 position cam switch to be used to operate a 3-speed blower motor. The motor is a 10 amp motor and has 3 wires that are used to control speed. The cam switch was rated at 660V 20 amps but when I received it, I noticed that it has AC-15 operational current rating (Ie) of 4/5 amps. If I am reading the label correctly. the 4/5 amps is related to 440v/220V (Ue). Other ratings are AC-3: 5.5A, AC2: 7.5A and AC-4: 1.5A. My questions are 1) Is it safe to use this switch with the motor I have 2) what is the difference between the 20 amp Ith ratting and the Ie operational ratings?
What is the importance of counter based plan & how is it scheduled?