IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO
11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE
LOADED ABOVE THE SOURCE GENERATOR RATING?
Answer Posted / hareesh k.s.
No.
The source generator rating is 100X1000VA/415X1.73=133A
therefore the maximum load that can bear by the source of
power supply is 133A.
but the tranformer maximum output
current=500KVA/11KVX1.73=26A.
therfore the maximum load rating that can bear by the
trasformer is 26A.
ie.500KVA,11KV transformer can loaded upto only 26A.
but the maximum source KVA is 100KVA
therefore the maximum output load rating of
tranformer=100KVA/1.173X11KV=5.25A
so the conclusion is in this case the tranformer can be
loaded upto 5.25A(11KV).
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
State the frequency for rc phase shift oscillator?
How to measure current and voltage in an ELV circuit
Define delay time.
electrical ques
why current flow to the opposite direction of flow of electrons???????????
how will calculate the safe starting current of 3-phase squirrel cage induction motor?
can we synchronize star system generators with delta system generators?
Yazaki india pvt ltd interview questions qurey related
Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
Draw torque - speed curve and load curve of induction motor? mark operating point ?
What kind of preventive maintenance are there for transformer?
If I have Energy Meter Ratio as 100:5 & Also I have CT Ratio as 50:5 then what will be my multiplying Factor(M.F.)
Define average demand?