IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO
11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE
LOADED ABOVE THE SOURCE GENERATOR RATING?
Answer Posted / k.prakashchandra
No. Tranformer is for only stepping up the voltage, not the
power which should not be allowed to rise above the
capacity of the generator
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how much cable size required for 70 kilowatt load.
Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?
what is the safety points of vaccum circuit breaker.
What are the temperature elements?
hello friends..... any one have papers or any study materials?sail ,hpcl...?
please send me previous year questions of jspl through which i could prepare myself for the test.
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
We have a distribution transformer of 750KVA/11kv/440v and an AVR (Servo Stabilizer) of 750KVA on the LT side of distribution transformer. Also we have an ACB of 1200A on the output of distribution transformer (that is on the input of AVR). We want to have an MCCB on the output of AVR. What should be the rating?
1.Z transform always lies around ? a) origin b) pole c) zero d) z=1. Multiples Mcqs which is bother me can’t find answers on internet. Some help required with little explanation . Note: this is not homework or related to any test. Thanks
How to Preparation of online test
what is cogging and crawling
What is the meaning of HT Trivector Meter ?
On what cycle does thermal power plant operate?
What is vaccum currcuit breaker.define with cause and where be use it device?
Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?