IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO
11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE
LOADED ABOVE THE SOURCE GENERATOR RATING?
Answer Posted / k.prakashchandra
No. Tranformer is for only stepping up the voltage, not the
power which should not be allowed to rise above the
capacity of the generator
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
where rlc series ckt used?
briefly explain the main blocks found in a microprocessor based system
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
ROC converges if pole and zero lies inside a) origin b) z=1 c) pole d) zero ? Explanation please? if ROC does not converges then?
1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?
Can you explain about TEE protection scheme?
What are the conditions to be satisfied for parallel operation of dc generators?
1. Can a 12v DC choke operate a 60v/12w PL lamp ? 2. Can a 230v ballast fire / operate a 60v/12w PL lamps.
What is the main purpose of c.f.b.c.boiler
What is the voltage gain or transfer function of amplifier?
How npn and pnp transistor works
what is the difference between interconnection and intraconnections in the circuit diagrams
sir vizag steel ka junior trainee ka paper kitne number ka ayega
What aturn on methods of scr?
what is the circutor?why we use it ?