Do you have different BOMs for a material in different plants?
Answer Posted / abhijit guharoy
generally we have following BOMs
1.Product Tree
2. Parent- component relationship
3. Multilevel Bill
4.Multiple Bill
5. Single Level Bill
6. Indented bill
7. Summarized parts list
8. Planning bill
9. where- used report
10. Pegging report
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is the use of mrp group?
In the monthly lot size proc, how to generate lot at the end of Period?
Question related to Production order status or status profile?
Explain what happens to plan after it has been converted into production order?
How can I use variable size items?
Difference between standard cost and variable cost.
How do you do capacity planning ?
Mention what is the difference between stock transport order and stock transfer order?
Difference between base unit of measure, production unit, order unit
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What are sequence, parallel, overlapping, splitting and where can we assign these
Explain Flexible Planning procedure or How many levels of Flexible planning.
What are all the 'sub-components' of production orders?
How did you configure the payscale structure?
What is the use of stock requirement list?