what is advantages and disadvantages of the Waterfall Model
and V-Model ?
Answer Posted / ramyab.mca@gmail.com
Hai...
WaterFall Model advantages:
It is a linear sequestial model
It is very simple model to implement
It is the first model.
It needs very few resources to implement
Disadvantages:
In this model there is no back tracking.
For example if any error occured an any
stage of software development,it cann't be
corrected in that build.
V-Model advantages:
It is also called as verification and
validation Model.
This means the verification and validation
will be done side by side.
It emphasies the strict process flow to
develop a quality product.
The errors occured in any pahse will be
corrected in that phase itself.
V-Model disadvantages:
It needs lot of resources and money.
It needs an established process to
implement.
It can be implemented by only some big
companies.
K,Byeee..
Thanks & Regards
B.Ramyasri
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
I have to give weights to 5 stones so that using a simple balance and the stone i should be able to weight any number between 1-100
. Is any graph is used for code coverage analysis?
What are the basic forms of variations?
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
What is smoke testing and user interface testing ?
How can you do the scalability testing?
Define performance and stress testing?
Write positive and negative test cases for forgot password?
Hi, what do you mean by internal auditing? what are the things they do in internal auditing?what they review? THNX in Advance
Diffrernce between client server testing and web server testing.
What are the cases why parameterization is necessary when load testing the Web server and the database server?
What is the different between SIT and UIT?
What are the differences between stlc and sdlc?
Can anybody give whole test cases for banking module.it should include from start to end .that will help me more.to do study.it should contain account,deposite,withdraw,fd,atm modules.?please try to give me??
What is defect validity ratio?