Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why transformer rating is in kva?

Answer Posted / veerendra

the transfor rating is in kva because as the iron losse &
copper losses in transformer depend on the volage & current
so depending on the losses the heat geeration occurs & hence
the rating is explained in KVA to give a detail how much
amount of power it can transfer without getting damaged.

Is This Answer Correct ?    18 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Electrical Grade Aluminum for Tubular BusBars. i am confused between 6063 and T6 or T5 and what is BS 2898 and BS 159?

1839


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2032


WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?

2279


explain different losses in a transformer.

1137


hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?

1926


In EB metering we face problem kva jump even in no load condition.can any one help to control this

1846


if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?

1419


how we can find of current direction(supply comming/out going direction) when a transmission line passing through sides.

2396


What are the specifications for conducting earth leakage test as per IEC standard?

2069


Why air circuit breaker off due to power failure?

1219


use of choke in APFC panels

5829


State ohm’s law?

1114


Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.

1966


what will happen reduce the transformer voltage from 415v to 406v, is it save the energy,? are this methodis good to reduce the energy.?

1526


The sodium vapor lamp is not glows when it is connected a distance of 5 meters above from gearbox, why ?

3683