AFTER CREATING THE SALES ORDER WE NEED TO DELIVERY THE
PRODUCT. WHEN U CREATING THE DELIVERY , THE SYSTEM SHOWS
LIKE " NO ZERO EA MATERIAL <XX> AVAILABLE" . HOW TO RECTIFY?
Answer Posted / syamantak
First of all we need to post stock into the plant for the
material using T_code mb1c; then only it will allow you to
Post Goods Issue the material in the delivery document for
the material
Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
Copying is not possible. because an entry is missing in Table TVCPL: TA TAN Message No. VL473
How is the 'shipping point' determined by the system?
What is the business process of excise tax and how do you relate that in sap?
Explain the assignments among organizational units in sd
Hi SD Experts, Have you created any Alternate Calculation Type (Alt Cal Ty) & Alternate Base Value (Alt Base Val) in Pricing? If so explain with an example? Explain in detail about the Procedure, Path, T-codes (if any), Logic, Analysis and finally resolution/ solution for calculating Alternate Calculation Type (Alt Cal Ty) & Alternate Base Value (Alt Base Val) in Pricing? I need your real time data examples more & more? Please do not give much importance to Theoretical definition concentrate more on Business Scenario & detailed procedure (Both Configuration & Customization) and Simple coding logic required if any from ABAPer from real time data? This question related to Pricing is most important as it is being asked more frequently in many Interviews? I have interview within 1-2 days? So, I request you to provide solutions to above question as early as possible? Your timely help would be greatly appreciated? Thanks in advance Regards
What is higher level item category? How it’s controlled?
What are the three levels that copy controls are set up? And what are the transaction codes through which it could be done?
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
Can you further subdivide a plant? If yes into what?
HAVE 100 GOODS WITH BATCH, CAN WE DELETE BATCH NOW
In Order - what have you done exactly, did you do the entire setup in SAP, and if yes, can you walk me through it?
We can define our own exchange rate types and use them instead of the defaulted types, ‘m’, ‘b’ and ‘g’. How can we overwrite default types in sd?
How do you define tax relevancy of master records?
When you create an invoice can you carry out pricing again?