what is the difference between site engineer & site incharge
Answer Posted / mayank jain
site engineer is responsible for a design factor and management of activities on the site .
site in-charge is responsible for a labor management and
material wastage.
Is This Answer Correct ? | 10 Yes | 12 No |
Post New Answer View All Answers
what's the formula for calculate pcc for matt(45mm aggregate)?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is mean by c32/40s concrete class
what is the type of earthing
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
WHAT DLC DESIGN IN CONSTRUCTION
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What will be weight of 0.5mm GI sheet per sq.ft?
What is difference between code and standard and specification?
Name the main components of a cad gui?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??