what is the difference between site engineer & site incharge
Answer Posted / sjtbehera
Site engineer is responsible for site execution.
but sit incharge is responsible for project execution
Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What are the different methods for drawing an arc?
Calculation of curtain wall of box culvert
Define Who designed the city of Washington DC?
During reclamation how can the occurrence of mud waves can be rectified?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Define absolute co-ordinates?
what is the productivity in aluminium shuttering per day
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
Draw the cross section of a boundary wall and label its part with detailing?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
if the nitrates more than 45mg/l in water lead to disease then what is it called
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is the specific gravity of rubble in plum concert