(1/10)18-(1/10)20=?
a.99/1020
b.99/10
c.0.9
d. none of these
Answer Posted / irfhan
The answer is option
d.none of these
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
A bus started from bus stand at 8.00a m and after 30 min staying at destination, it returned back to the bus stand. The destination is 27 miles from the bus stand. The speed of the bus 50 percent fast speed. At what time it retur4ns to the bus stand
Calculate the area of the triangle in square cm if a right angled triangle where the length of the shorter leg is one third of the length of its hypotenuse. And the length of the shorter leg is 7 cm.
Find the next series: AE BH CM DU?
a cylinder ingot 6cms in diameter and 6 cms in height is and spheres all of the samesize are made from the material obtained.what is the diameter of each sphere?
In the month of march a basketball team played 60 games and won 30% of its game played. After some time the team raised it to 50%. How many games did the team had won to attain this average.
In a club there are male and female members. If 15 female quit then the number of males will become double the number of males. If 45 males quit no. of female becomes five times the number of males. Find the number of females.
In school there are some bicycles and 4 wheeler wagons. One tuesday there are 190 wheels in the campus. How many bicycles are there?
the matrix of a(7,9) was given.the address of the first byte of a(1,1)=1258.it takes 4 bytes to store the nuymber. then calculate the address of the last byte of a(5,8)
USA + USSR = PEACE ; P + E + A + C + E = ?
One passage was on playing cards. know how many diamonds and etc.
Adam stands facing towards northwest direction.He walks 61 m and then turns southwards and walks another 60 m. How far is he from the starting point.?
how to get the system time dynamically in orcle
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.
There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.
Hi friends i am new to this site. Pls provide me the KVB clerical exam model question papers. pls send to mail id mailstoaaa@gmail.com. Hope u guys will help me.