Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In a 11kv/433v transformer,at the LT side ie 433 V side why
do we need to put 3.5 core Cable upto Panel.The full load
rated Amps is 666 at LV side.What value of current will flow
through the Nuetral Conductor.Why can't we use 4Core Cable
instea of that?

Answer Posted / hanmanth reddy y

In a three phase system with star connected secondary
(433V side) if two phases are fully loaded to 666A and the
third phase not at all loaded the current through nuetral
conductor will be 666A. But in practice in a three phase
system that the third phase not having any load and other
two phases fully loaded is not in practice. If all the
three phases loaded equally no current flows through
nuetral and nuetral cable is not required.

Based on the requirment of transformer insulation nuetral
earthing has to be done at the transformer terminal only.

Nuetral is neccessary for single phase loads. If the
nuetral is dispensed entirely it is not possible to supply
power to single phase loads. Normally even in worst case as
huelistic judgement the nutral current will not exceed 50%
of phase current under unbalaced load conditions. Hence it
is appropriate to select cable of 3.5 core rather that of a
4 core cable.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is gas turbine intercooling ?

2099


What is knee point voltage?

1135


DEFINE BREAKING CAPACITY OF BUSBAR & HOW IT IS CALCULATED?

5217


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1927


Cb closed condition if there is a tcs fail whether cb will trip or not

1822


HOW WORK HEAT PLATE EXCHANGER

1983


application s to shunt coil

1911


What happen in ups if phase reverse?

2279


why did youi choose this career?

2214


why sielent pole is used only in hydro generators and not in turbo generators

4180


defination of lines

1995


What happen if 200 KVAR capacitor connected to power continuesly?

2119


What are the symptoms of a bad PG card of a drive (inverter) esp. of Yaskawa Ac Drives (inverters) G7 ?

2047


how many joints are allowed in underground HT cable of 1 KM

1868


HOW TO CALCULATE CAPACITOR BANK OR HARMONIC FILTER CALCULATION

2304