Whats meant by trivector meter where it is connected at the
substation?
Answer Posted / mamatha
Trivector meter is Electronic type Energy Meter which
measures energy parameters, like active energy, Reactive
energy,apparent energy, Power Factor, frequency etc.
Through which we can know how much enregy recieved or
sent.Trivector meter has 2 types, one is 3ph 3wire meter n
other is 3 ph 4wire meter.
It is conneceted in the substation to incoming or outgoing
feeders to know how energy is given out or recieved from
other end, or to Transformers on HV n LV side to know the
Transformer loss.
Is This Answer Correct ? | 252 Yes | 27 No |
Post New Answer View All Answers
WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?
What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?
What is meant by derating factor?
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
Why use the vcb at high transmission system ? Why can’t use acb?
sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.
what is the difference between droop mode and ischnorous mode in thermal powerplant?
I have a 380 KVA DG set. How can i find out 1. My Fuel Consumption per hr ? 2. Electricity produced in 1 Hr. ? 3. If load varies then how does it affect fuel consumption & electricity produced ? Please HELP !!! Really need an answer.
Dear sir, iam completed iti ncvt electrician 2000-2002 & diploma electrical eng completed 2008-2010 distance education in rvd university, still i got B licences only but my working company want C licences, how to i get c licencese pls reply me iam in critical situation thank you karthick 9841637803
When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
Use of switch mode power converter in real-time basis?
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.
what type of questions are asked and howmwny questions belong this catagory?
How o select the electrical fuse?.What are its characteristics.How to select the material od fuse?