Answer Posted / satendra
when the demand is more on grid and generation is less frequency get decreased and vise - vers.
so in order to maintain this near to 50hz grid gave a schedule to power generating station of 15-15 min. for 24 hour's in advance ( prediction on the basis of previous records )
satendra.svnit@gmail.com
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
As you achieve greater success with the company after some years, Will you like to be a share holder in our company?
What is ferro-resonance in electrical system? Why it occurs and what are measures to prevent it?
Is better to supply the voltage for static exciter from the auxiliary power source or from the SG terminals? And why?
What is pd controller?
How can maintain our H.T. motors used in cement plant. please send me procedure.
How we calculate DC inducation moter Amp? Sir pls give me formula......
I want formula to calculate cable size as per load given in length & amp. I searched many sites but didn't right answer. Please reply me asap.
What is FM200 Gas??Applications........
Why PT voltages are measured with respect to ground? What do u mean by voltage or current polarized.
Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
what is The difference between national electrical code and I.S.Code (electrical) and what is the value of NEC in electrical engineering field
what should be the acceptrd value of winding resistance for 2.5MVA transformer
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
In single phase capacitor motor, if the motor rotate reverse direction then how much power will be consumed by the motor and why?
Why a tesa lamp is glow between two phase?