Answer Posted / satendra
when the demand is more on grid and generation is less frequency get decreased and vise - vers.
so in order to maintain this near to 50hz grid gave a schedule to power generating station of 15-15 min. for 24 hour's in advance ( prediction on the basis of previous records )
satendra.svnit@gmail.com
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what the function breaker failure scheme, how is it operated
What are the advantages of hydropower?
What are the types of transformers according to the arrangement of iron cores?
WHY BREAKER ARE USED IN SUBSTATIONS?
Batteries. What is the difference between Lead and Nickel batteries ?
What is the settings of distance protection relay in 400 kv line
in electrical control panel. how can i choose the cable rating. (example - 11kw motor, 18-25A mpcb}
What is 11 N1 and 12 N2 in single phase Transformer ?
Define filter?
salam&hi, i need to know about how can i calculate an enough current for the new building before i submit it to the suppliers
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
why the rotor current becomes in steady state during high slip region? please verify with equations.
As you achieve greater success with the company after some years, Will you like to be a share holder in our company?
what is the difference between unarmoured & Flexible cable? How to identified?
how many single tension hardware are required on a double circuit transmission tower?