In a team of 12 persons, 1/3 are women and 2/3 are men. To
obtain a team with 20% women how many men should be hired?
Answer Posted / yours lovingly
for 2 women 8 men are nessary to become 20%
here women are constant i.e. 4 so another 2 women 8 more
men is required to become total 20%
2/10=20%
4/20=20%
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Find the hypotenuse of a right angle isoceles triangle whose area is 50.
There are Brown and Black cows. In five days four black cows and 3 brown cows give as mush as milk that four brown cows and 5 black cows give in four days. If the black cow gives 10 litres of milk per day, how many liters of milk the Brown cow will give in one day? (Numbers are not certain)
Technical questions
low temperature at the night in a city is 1/3 more than ½ hinge as higher temperature in a day. sum of the low temp and higherst temp is 100C. then what is the low temperature
Gaurav buys milk at Rs. 60 per litre, adds water to it and then sells it at Rs. 75 per litre. What should be the ratio of milk to water to get a profit of 37.5%?
Sunny ate 100 apples in five days, each day eating 6 more than the previous day. How many apples did he eat on the first day?
If the circumference of a circle is 100 units, Then what will the length of the arc described by an angle of 20 degree ?
What do you think are your personal strengths and what are the areas where you need to improve as an individual?
how 1000000000 can be written as a product of two factors neither of them containing zeros
x:y=3 and x+y=80 what is the value of y?
quants,logical,verbal
In an exam, a girl scores 85% in one subject and 88 % in another subject. What percentage does she score in the third subject to get an average of 88% marks?
Ram gets 148 marks for 20 questions. +10 for correct. -3 for wrong. How many correct answers?
solution of system of equations y-z=0,x+8y=4,3x+4y=7z is
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.