WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1
M3,10M2,1 TON RESPECTIVELY
Answer Posted / dushyant bansal
The Permissible wastage for cement is 3%, for bricks it is
2.5 % and for tiles it depends on the floor shape and size
which can be permitted upto 6%, while wastage is steel is
allowed only 2.5%
| Is This Answer Correct ? | 13 Yes | 9 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
What is the largest concrete dam in the world?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Any strength is a stress but any stress is not strength
What are the uses of groynes?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
how to prepare site mix design
yasser arfatcompleted his degree in civil from which university
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What is OSHA compliance?
How is calculate the cube molt
How and where are aqueducts built?
What is the compressive strength of fly ash bricks?
How do you maintain water pressure?