What is the role and reponsibilities of Electrical
Engineers in construction field?
Answer Posted / saleem
As an engineer our responbilities on site is make sure that
the electrical installation should be as per IS code or
National code as applicable according to authority,proper
designing of system,maintenance view,feature extention etc.
| Is This Answer Correct ? | 24 Yes | 4 No |
Post New Answer View All Answers
Which is the oldest hydropower plant in india?
is there any current and voltage drop on liquid resistance starter water/soda tank ?
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
What is making & breaking current ???
dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour
how can maintaince the acb contactor moveing and fixing kit
why the perameters of secondary circuit are more important then that of the primary circuit of induction motor?
Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?
what is the disadvantages of common earthing for AC and DC equipment? (i am talking about inverter control room and inverter duty transformer earthing is common...?)
In which working principal temperature transmitter work.explain in detailed.
why and how voltage sharing in transformer, during magnetic balance test ?
How many types oil using in transformer ? How many letars using in transformer..?
Good day everyone,currently in our premise we using 30kw slip ring motor with resistance bank which we use as forward and reverse at conveyor bar handling. So,my question is how do we calculate the resistance bank which is suit the motor. Kindly,assist me... thank you
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating