i have one transformer 1000kva, 11/.433kv. we are using
200/5 amp. ct unit for measuring purpose, & one 800 amp.
V.C.B Unit for the same t/f operate, i wants to known the primary
current of T/F is only 53 amp. why we used 800 amp.
V.C.B ? & 200/5 amp. CT Unit.
Answer Posted / vinit patil
You are right, you should fight with your electricity board
regarding the HT Metering CT ratio. You should actually
required 100/5 ratio.
But while deasigning VCB it is always prfarable to go on
higher side because it can sustain the heavy short circuit
current. One thing should be noticed that the protection
CTs should be as per the Primary current of the ransformer.
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Why efficiency of generator is higher than motor at a particular load?
what is the function of bearing in dc mchine" and where it is placed
what is th basic difference between a d latch time line and a d flip flop time line???
As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?
sir, Is their any measuring unit of knoking? please explian?
Which type of DG need Netral Earthing?
What is Control & Relay Panel? And Remote Control Center?
5.WHICH TYPE WELDING PROCESSES USES NON CONSUMABLE ELECTRODE.........
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
what is the transformer rush current?
How you calculate the repturing capacity of a HRC fuse
What are diffrent type of road taxes?
what is a composite error in current transformers, why occurs & in which it will occur i.e, either metering ct/ protection ct
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
What are the advantages and disadvantages of open loop control system?