what is the difference between LT & HT Motors
Answer Posted / b soni
LT Motor Worke Under 1KV & HT Motor Work Over The 1KV
LT Motor Requaird mor current then LT Motor
| Is This Answer Correct ? | 31 Yes | 61 No |
Post New Answer View All Answers
What is the complete procedure of erection of electrical panel in industry
What is 100% protection of generator? Why 100% is not used but 95% is generally used?
What is the difference between a 3 winding and 2 winding Potential Transformer
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
How to find out damper winding failure for synchronous machine?
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
What are the temperature elements?
how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???
I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF
what is the use of Auto re-closer?
What is the difference between line drop and percentage line drop?
What is method of calculating the fault current for a MDB, 50KW, 3PH, 415V, 50HZ?
I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing
I am completed DEEE in tamilnadu, now i am working in andhrapradesh with 2.5 year experience in relavent field. capacity of the tranformer is 11KV, 1MVA Transformer, i am eligible for getting c licence in andhrapradesh pl help me.
why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.