Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate earth flat size for 250 Kva DG and
transformer?

Answer Posted / ramesh p n

Voltage is the potential difference between two Conductors,
for Single Phase and the fro three phase system it is the
potential Difference between three phases and the neutral
for Example in india WE have 240 Volts A C Voltage for
single phase and 415 V for 3 Phase,

Forula to determine Power, Voltage and Currents

1 Phase : P = V X I = { Power(in watts)= Voltage X Current}


3 Phase P = rootof3 X V X I cos Phi,


Power = 1.732 X Voltage X current X Power Fator

Is This Answer Correct ?    17 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In the magnetic fluxes, what is the role of armature reaction?

1157


What is the role of Dedicated earthing in UPS System?

3101


Why an ac systems are preferred over dc systems?

1107


Why corona leads to production of Ozone and glow of the color VOILET?

1969


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2025


Anybody tell me about modbus hex address of l&t trivector meter er300p??I want to read voltage,current,kwh etc via rs485...If anybody have a manual then send on my mail..Brijeshmodi18@gmail.Com

1907


what is the role of energy meter in distribution system ?

1183


what is the meaning of neutral displacement ???

2744


Explain the propagation of harmonics in the network and influence of phase angle of harmonics.

1966


what type questions asked in hp cl

1862


We have 110Vac ,10A ac supply which is converted into 110VDC & How much DC current? which factor is reqired for dc current calulation?

5148


what is interpose? where it is used and why it is used?

1060


Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.

2587


solor panels arrange some angle,panel is flat fitted energy was produced or not why?

1901


what is package substation.how many types they have

2107