what is the diffrence between R Y B phase and why it is
called RYB
Answer Posted / avtar singh
above answer is right but we always see the phaser diagram
of the 3 phases in clockwise direction so we say RYB
| Is This Answer Correct ? | 10 Yes | 7 No |
Post New Answer View All Answers
How to design inductive load for 3 phase 440v and maximum 5 amps for star or delta? Can we use a 15kW, 1450rpm motor for 15kW, 960rpm apllication?If yes.how......n.if thesame motor used what`s it`s sideeefect.
Difference between low impedance and high impedance Restricted Earth Fault
what is the carona effects meaning in HT line transmmission system
How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).
What is MS-EXCELL?
i will applied in 1U-1W on 440 volt primary delta side. what is the result of magtic balance test
dear sir/madam i want to get some knowledge about RRB EXAMINATION(section engineer) 1- what is minimum cut off 2- wht portion is major portion . 3- can any body provide Sample paper. thanks & regards ashish
During Starter Panel Com missing I Found The Main Incomer 40Amp MCB 10KA Trip When Motor Change Star To Delta Motor Rating 20HP BUT When We Use Same MCB To Other Motor It Does Not trip Or What Is Necessaries for Star Delta Starter MCB SFU MPCB OR MCCB And What are The Breaking Capacity of MCCB in the Motor above 15HP
how we explain parallel paths armature winding?
What is essential to prove safe isolation of electrical circuit?
How do apply electrical 'c'license......pls advice
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
In case of generator when we consume more power produces by it why load on generator increase and starts sound more. and how it is adjusted..
for 11KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV UG system what will be typical per KM "R" "L" "C" parameter.
What is shutdown of electrical sub station?