Answer Posted / satya dev
As per IE Rule Below than 1000 Amp. Load we can use MCCB &
Above than 1000 Amp. Load we must be use ACB.another reason
is the Range of Short Ckt Capacity of ACB is Greater Than
the MCCB.
Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
Why 30kw 40 hp 4 pole 3ph induction motor over heated?any steps on reduction in heat?
3- What is the target from Zero Impedance, Single Phase Imp., S/C Imp. and magnetic balance tests?
What is the actual calculation for transformer short circuit test?.
how to fit 3 HP crompton gear motor with conveyor with the use of staring delta starter or ordinary starter?
WHAT IS IEC? & WHAT IS BENEFIT TO PRODUCT FROM IEC?
Why L.T.Cable voltage rating is 1.1kV,where as system voltage is 0.415kV?
Draw the circuit of clapp oscillator?
in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.
Why are lt windings placed near the core?
How to connect the chemical earthing and complete process tell me plz
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
WHERE NEUTRAL WIRE IS CONNECTED AT DOMESTIC TO TRANSMISSION LINE(SINGLE PHASE TO THREE PHASE)
what is the difference between skin effect
HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)