In India why is the supply frequency 50hz? I need a
particular answer for it..
Answer Posted / anas
i am noy sure of the answer.in india we are using hydro
electricity w
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
Hello Guys !! i want to rrb section engineer electrical(signal) previous model papers? any body help me?
What is difference between Sample test and Routine test in safety standard?
what is the IPC ? & what the uses ?
In general bus riser follows the bus section in SWGR. What are impacts if bus section follows bus riser?
Pls explan the OLR setting in VCB at HT yard
What are the necessary components of the feedback control system?
What is the polarization index value ? (Pi value)and simple definition of polarization index ?
What is the earth treantment procedure?
wat is the first thing dat is needed, 2 lay a cable in some area??
I have an existing old MCCB. ABB Model SACE, the rating are: Ue = 660 volts, Iu =1250 Amps, 3 poles, Ith (max) =800 amps at 45 deg C. I need a circuit breaker for my 3 phase motors, 380 volts 60 hz. the supplier required the minimum ampacity of the breaker to be 911 amps. can i use this breaker with rating of Iu =1250 amps but Ith = 800amps maximum?
why the earth is taken minimum in supplying? wather it the proportional factor to getting work any equipment or a power plant?
What is the difference between Delta & Wye windings?
who can measure the size of power cable?
Between educational qualification and practical work experience, give us a brief explanation on your practical experience in your past Endeavour that you performed well to the satisfaction of your past or present employer?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.