how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / anoop didwnaiya
2% of the project only
| Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
Wats the formula of eccentric footing and how was calculated from concrete qty
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
important question on stones
Which is the direction for positive angle?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
What is meant by cad?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
how much cement and sand required for 1cum rr masonry
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
to minimize budget cost of building , what can i do
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How to calculate volume of concrete & steel on tank foundation & ring wall ?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L