How much KVAr bank reqired for 630 KVA transformer on full
load for maintain power factor upto.99
Answer Posted / dhanesh koshti
Capacitor calculation is depends on load. if 630 KVA transformer is loaded fully with load p.f.=1 then no compansation is required but if the same is fully loaded with load p.f. = 0.8 then, kvar required is calculated as below:
KVAR = KW ( tanǾ1-tanǾ2); Ǿ1=old p.f.angle, Ǿ2=new pf angle
= 504 ( 0.75 - 0.14) [ here, KW=504 because, 630 X 0.8 = 504]
= 307.44 KVAR
say, 300 KVAR bank is required at load end for compansation
Is This Answer Correct ? | 15 Yes | 4 No |
Post New Answer View All Answers
Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason
I am having a 42KW 3 phase electrical heating furnace, heating element is 80/20 nichrome material, my connections is made in such a way that 2 star connection compromising 2 coils per phase so totally 12 coils, shall if i use it unbalanced star condition (instead of 2 group of 3 phase or 1 group of 3 phase, connecting 4 phases of 5 phases) what will be the consequences and is it acceptable?
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
HOW TO CHECK THE VECTOR GROUP OF A TRANSFORMER YD11?
what are the safety measures of induction motor?
What is the phase relationship between the primary and secondary voltages of a transformer?
what is the meaning of osr in transformer.
Why mostly the HV side of transformer has Delta?
how to increase senstivity of ct
how we calculate the dick for a pole?
Write down the design procedure of commutaj.
in conventional fan regulators how the current varies with speed?
explain different losses in a transformer.
what is the importance of Partial Dischage test for Electrical Equipments
is there any lightning by passer is arranged in ship like buildings?