why loss of strength in concrete in 7 days cube test i am
not geting mim 7 days strength that is 67 percent for M-35
and my mix design is perfect there is no doughty,and my
results are near to 7days percentage but not 67 percent.
Answer Posted / v.purushotham
The fallowing check points to be done:
 In between interval you should check the mix ratio
i.e. volume/ weight of material,
 Check cement ratio,
 Check slump while pouring the concrete,
 Check the proper mixing of concrete,
 Check the procedure of filling and compacting of
cube mould,
 Check the bulkage of sand,
 Check the gradation of material every 15/ 30 days
interval and compare the designed materials properties,
 Last but not least check the proper curing of
concrete cubes.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
Time required for curing of wall tiles before fixing
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Explain the design for rcc multi-storied building?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
Difference between lime, distemper and plastic emulsion?
crank types
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Which is the direction for positive angle?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how much used soil in 1 brick of standard size?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
What are the common ways of demolition?