why loss of strength in concrete in 7 days cube test i am
not geting mim 7 days strength that is 67 percent for M-35
and my mix design is perfect there is no doughty,and my
results are near to 7days percentage but not 67 percent.
Answer Posted / v.purushotham
The fallowing check points to be done:
 In between interval you should check the mix ratio
i.e. volume/ weight of material,
 Check cement ratio,
 Check slump while pouring the concrete,
 Check the proper mixing of concrete,
 Check the procedure of filling and compacting of
cube mould,
 Check the bulkage of sand,
 Check the gradation of material every 15/ 30 days
interval and compare the designed materials properties,
 Last but not least check the proper curing of
concrete cubes.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
hi guys what happens if you are absent for a supplymentry exam?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Explain what is 1/8 on the architect ruler denotes?
What will you do if you encounter problems like accidents?
What are your goals?
Explain moment of inertia?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is meant by autocad?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Concrete cover for slab, column, beam and footing?
Stringer How many cm goes to landind
how many type of admixtures for water stored structure?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.