Answer Posted / rajkumar
vacumm is only maintaining for rising the turbine workdone,
how means it will reduce turbine outlet temperature due to
long time expansion wih out condensation of steam on last
turbine stages corresponding to the vaccum pressure,
that means max heat will be recoverd on turbine,
and also already temp less of turbine exhaust so condensor
cooling water flow also needed less
| Is This Answer Correct ? | 19 Yes | 13 No |
Post New Answer View All Answers
Use of switch mode power converter in real-time basis?
why burdens of VTs is more than CTs?
How to operate a ac chilar plant?
what is the difference between earth leakage and earth fault?
1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to reconfirm its base capacity.
How CFL &T5 tube light glows?
working of diesel generator ?
Testing report of Earthing of 3.15 MVa PTR.
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
When is lag lead compensator is required?
How will polarity test of Dy5 Transformer ?
how to calculate the Neutral transformer impedance?
What are the parameters of water ( Water quality )to be monitored in Centralised HVAC ( water cooler chillers )
How will you justify IR value and Charging voltage of any motor,transformer and Cables.......???? . . . . . . . . Plz tell me any body Baljeet Singh, engineer_89@refiff.com
Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.