Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

While starting a high capacity motor, it takes 6 times the
full load current. Why it doesn't trip relay or CB's in
that network?

Answer Posted / praful nandankar

Circuit breakers are given sufficient delay time,hence the
relay will not trip when motor takes 6 times the full load
current.

praful nandankar

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.

2180


Good day everyone,currently in our premise we using 30kw slip ring motor with resistance bank which we use as forward and reverse at conveyor bar handling. So,my question is how do we calculate the resistance bank which is suit the motor. Kindly,assist me... thank you

1764


What is the method for testing the differential protection stabilty in generator? When the time of starting What will happen if differentail protection connection wrong means?

2329


If Polarization index of motor 8.75 at 500volts of medium voltage 4.16 KV motor what this mean winding good or bad pl answer if any reffrence book give me the link

2164


Why is voltage is required to be within permissible range for an electrical equipment?

1767


How will change the frequency in distribution side?

1829


In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.

2171


Define relative stability.

1103


What is turn ratio of a transformer?

1296


how to determine the inrush current of a transformer

2662


EXPLAIN THE WORKING OF SERIES REACTOR IN HT CAPACITOR BANKS (FOR VOLTAGES & CURRENTS)

8348


for opening electrical shop, tips needed.

1890


main difference between ac and dc?

1743


What are the different power system losses and how can it be eliminated?

2110


what are the range of memory address in plc for L&T lx7 4A

2390