how many average of shuttering in one cubic meter concrete

Answer Posted / sjtbehera

look shuttering are done to cover the concrete to a
minimum period so that it will become hard. it's
calculation are done by sqft or sqmt. for one cubic mt
concrete it can calculate by covering the area of structure
in length x breadth or height.

Is This Answer Correct ?    21 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does civil status mean?

686


How to find the cuplock pipe qty in staging for Minor bridge?

727


Calculation of curtain wall of box culvert

5326


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2251


what is the mix design for M:60 with micro silica andmetakaoline?

1810






why development length = 50D . why not 100D

1484


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

1415


How many square meter can a worker/labor demolish a structure per day?

1526


what is tension & compression of steel bending.

1840


what is the list of building construction equipment & teir output?

1697


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

10832


What is the use of extend command?

727


how to calculate steel for slab or footings?

1195


can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

1807


What are the advantages and disadvantages of lead products in construction?

744