how many average of shuttering in one cubic meter concrete
Answer Posted / sjtbehera
look shuttering are done to cover the concrete to a
minimum period so that it will become hard. it's
calculation are done by sqft or sqmt. for one cubic mt
concrete it can calculate by covering the area of structure
in length x breadth or height.
| Is This Answer Correct ? | 21 Yes | 9 No |
Post New Answer View All Answers
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the purpose of Chipping in the heavy foundation?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
How to take labor charges for construction of 1cum of concrete?
Can we apply curing compound on ceiling (slab Bottom)
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Explain what is change order request?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
what is the use of beam end forces while using a staad ? wha they are show
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the usage of zoom command?
What is the release of lien?
what is a well
Exterior Joints,define