What is the Difference Between the SCADA & PLC ?
Both it also control and Supervise Then what Special in
Scada & PLC?
Answer Posted / niyaj
PLC is a control device .It Should not monitoring the
process.and SCADA is graphical monitoring device it should
not process any control activities.SCADA interface with PLC
for real time Control & Monitoring purpose.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
compare between starting charactristics of synchronous motor with those of 3Q Squirrel cage induction motor
How to select a contactor? How many types of contactors are available
what is the best transformer oil breakdown voltage?
how was your last weekend.
what is servo motor and how it works?
apti mainly on logical reasoning, verbal and non-verbal ability (70 percent) and remaining technical. I was in ee but technical had mech ques like on turbines and welding.
1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be
What is 100% protection of generator? Why 100% is not used but 95% is generally used?
How to select the cable and voltage drop in circuit?
1. How many types of mangers? 2.How many types of capacitors? 3.pls tell me normally types alternator problems?
Define bibo stability.
Draw a circuit diagram in which if button is open we can use socket and bulb as a series test circit and if button is close than simple we can use socket as any load purpose.
What happen in ups if phase reverse?
What is the different types of cable & current capacity of cable
ratings of lightning arrester