What is the Difference Between the SCADA & PLC ?
Both it also control and Supervise Then what Special in
Scada & PLC?
Answer Posted / niyaj
PLC is a control device .It Should not monitoring the
process.and SCADA is graphical monitoring device it should
not process any control activities.SCADA interface with PLC
for real time Control & Monitoring purpose.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
briefly explain the main blocks found in a microprocessor based system
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?
How many size of cable required for a 300m long and 30kw inductive lode
In Electrical 'Single Line Diagram' cable nomenclature shows "2 X 1C X 630sq.mm to be provided for one incomer. The question is how many cable to be proved for one Incomer.
How can get elongation of 2 k.G aluminium, if elongated aluminium dia is 2.5 mm?
why tertiary winding is used in transformer with diagram?
what clearance required for 4.5 mva dry type transformer?
ELECTRICAL DRIVES: can a motor load system with passive load torque can have equilibrium speed in second quadrant
In the N-series schneider reclosers. What is the difference between current during fault time and current at tripping? This appears in the Event log in an event of a trip out.
Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage
how can i change the rotation of the AC single phase induction motor and show me by diagram
why asa method ZPF method is more accurate than ASA method?
Why a Permanent Magnet Generator has higher frequency as compared to frequency of main alternator?
block diagram of 2 ups system connected in parallel mode?