how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / ratheesh
cement = 7.5 kg
sand = .0076 m3
Aggrigate = .015 m3
| Is This Answer Correct ? | 16 Yes | 9 No |
Post New Answer View All Answers
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
hi guys what happens if you are absent for a supplymentry exam?
where can i get the previous question papers for rrb section enginerr (civil)
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Define current ucs?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
How to calculate steel for beam slab and column
What do we mean by partial moment release ??
Forces in a Shear Wall are in plane or out of plane ?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how to compute slab reinforcements on step by step procedures??
use ofr concrete as per grade ?